I know some of the pictures I am posting are not great but it is snowing and I wanted to get this going and decided that crummy pictures were better than none at all. Any interested parties can shoot me a message and I will be able to get better ones tomorrow. I am going to try and upload a list of parts but if not: Power disc brakes, fresh 350, fresh TH400, 12 bolt posi with new center section and bearings and welded square. Mustang II front end, currently manual rack and pinion but have the power unit that can go in - power rack needs rebuilt. A/C, heat and defrost. A/C not hooked up yet. Edelbrock Fuel injection. new wiring, gauges, ebrake, upholstery is in process and it obviously still needs to be painted. Flow master exhaust, wide band O2 sensor and interface to set up fuel injection and provide closed loop back to Edelbrock system. I have all of the chrome for the body and a good ***le. I have been driving it a little bit and it runs strong but I need to set up all of the fuel injection so I have not put a lot of miles on it yet. Let me know if there is anything else you want to know. View attachment 3418430
The weather has been nasty and I have not been able to get the car out and get new pics but hopefully it will clear this week