Discussion in 'The Antiquated' started by Roothawg, Dec 9, 2023.

  1. Roothawg
    Joined: Mar 14, 2001
    Posts: 25,310

    Roothawg
    Member

    Kinda both. Funny thing is that right after I answered Dave, my framer called. Miscalculation on the height inside due to the slab and the trusses. 18' sidewall on the outside of the building, 17'1" on the inside.

    So, the 9' ceilings will be left alone in the master bedroom, bathroom, laundry and closet. On the other side we have to reduce the height to 8' to compensate or I would end up with a 6'8" ceiling upstairs in the 2 other bedrooms and one bathroom. So, the shop office, upholstery room and storage is now going to have a 6' 8"ceiling. Oh well. I'm only 6'2". Plenty of room.
     
  2. Roothawg
    Joined: Mar 14, 2001
    Posts: 25,310

    Roothawg
    Member

  3. Roothawg
    Joined: Mar 14, 2001
    Posts: 25,310

    Roothawg
    Member

  4. Moriarity
    Joined: Apr 11, 2001
    Posts: 34,038

    Moriarity
    SUPER MODERATOR
    Staff Member

    where is todays picture?
     
  5. dirt car
    Joined: Jun 26, 2010
    Posts: 1,289

    dirt car
    Member
    from nebraska

    Quite the building, were I a young man the way our weather patterns have changed in the Midwest I would probably opt for some form of earthen storm structure, no idea how it would come about however..
     
    Sharpone, porkshop and Roothawg like this.
  6. Okie Pete
    Joined: Oct 29, 2008
    Posts: 5,508

    Okie Pete
    ALLIANCE MEMBER

    Dirt car , I remember Mother Earth news building a structure out of used car tires , tamped dirt with a stucco finish. Sorry to have interrupted the progress report
     
    Sharpone, porkshop and Roothawg like this.
  7. Roothawg
    Joined: Mar 14, 2001
    Posts: 25,310

    Roothawg
    Member

    Yesterday I had to mow my current place and do a few other things. We got like 9" of rain in 24 hours over the weekend. Which, in itself, is unheard of in August. I was mowing in 2" of water in the ditch, but it had to happen. Bermuda never sleeps. I think my Social Director wants to go down tonight and do some measurements for the wedding reception area. Hopefully, there is something to take pics of. Yesterday was adjusting for the ceiling deal, so maybe today we can start on the second floor.
     
    drdave, Sharpone, porkshop and 2 others like this.
  8. Roothawg
    Joined: Mar 14, 2001
    Posts: 25,310

    Roothawg
    Member

    Sounds like we have a second floor, the framer called me with yet another issue. This is wearing me out. I'll try and run out there tonight and take some pics. I need to check in on progress anyway.
     
  9. I have heard from so many people that being your own sub contractor will make sure it is done right but is a living nightmare. Most people can not take any initiative and will stand around with their thumb up their butt waiting on someone else to make a decision(which is you)
     
    drdave, Sharpone, porkshop and 2 others like this.
  10. Roothawg
    Joined: Mar 14, 2001
    Posts: 25,310

    Roothawg
    Member

    The biggest problem I am running into is marrying a steel building to standard framing. The framer called this morning and some of the structure that was welded to the steel building trusses was in the way of the LVL beams on the second floor ceiling. They are going to have to cut it out and reweld it later about a foot higher.
     
  11. TraditionalToolworks
    Joined: Jan 6, 2019
    Posts: 458

    TraditionalToolworks
    Member
    from NorCal

    Holy flock, your wife made out good!o_O

    Good thing she left you some space...;)
     
  12. Roothawg
    Joined: Mar 14, 2001
    Posts: 25,310

    Roothawg
    Member

  13. Roothawg
    Joined: Mar 14, 2001
    Posts: 25,310

    Roothawg
    Member

  14. Roothawg
    Joined: Mar 14, 2001
    Posts: 25,310

    Roothawg
    Member

  15. Roothawg
    Joined: Mar 14, 2001
    Posts: 25,310

    Roothawg
    Member

    Looking down over living room IMG_3993.jpeg
     
  16. Roothawg
    Joined: Mar 14, 2001
    Posts: 25,310

    Roothawg
    Member

    IMG_3991.jpeg The raised area is all storage/upholstery shop.
     
  17. Yep...that's awesome. Very happy for yall...and little bit jealous at the same time haha
     
  18. Lone Star Mopar
    Joined: Nov 2, 2005
    Posts: 4,034

    Lone Star Mopar
    Member

    Man thats coming together quick ! I've been wondering about how mixing the steel & wood framing would work out.
    Couple questions, what's the advantage of steel framing & If you were to do it again would you use wood ?
     
    Last edited: Aug 14, 2024
    Roothawg likes this.
  19. Roothawg
    Joined: Mar 14, 2001
    Posts: 25,310

    Roothawg
    Member

    Steel is far superior as far as longevity. I have seen a few post and beam (pole barn) styles around town after a storm and the results aren't pretty. Steel may end up getting re-sheeted, but wood almost always are destroyed. Plus, the wooden posts have a life of about 30-40 years. Not a big deal if you are 60 years old, but what about if your kids have to sell it later?

    It's not that big of a deal marrying the two. My issues are more of a lack of understanding between the guy doing the drawing vs, the framers expectations.
     
  20. Roothawg
    Joined: Mar 14, 2001
    Posts: 25,310

    Roothawg
    Member

    One thing I should add is that this thread isn't me bragging or showing off. I am doing it to chronicle the build, mainly because I am so lazy I would never take pics. Plus, this helps a lot of guys visualize what it takes to get there. It is more complicated than one would think. Would I do it again? I would. I would make the sidewalls 20' though.
     
  21. Lone Star Mopar
    Joined: Nov 2, 2005
    Posts: 4,034

    Lone Star Mopar
    Member

    That makes sense on the metal frame work, Especially as we're both in Tornado prone areas. I can't see going through all that effort & not building something to last.
    I appreciate you taking the time to share your progress & answer questions as I'm learning from your efforts.
     
    porkshop likes this.
  22. Moriarity
    Joined: Apr 11, 2001
    Posts: 34,038

    Moriarity
    SUPER MODERATOR
    Staff Member

    no window looking out to the shop from the shop office? how will the boss keep an eye on productivity???
     
  23. poco
    Joined: Feb 9, 2009
    Posts: 1,424

    poco
    Member
    from oklahoma

    Finley looking like a house. You will enjoy living in it and working in it. Don
     
    porkshop and Roothawg like this.
  24. Roothawg
    Joined: Mar 14, 2001
    Posts: 25,310

    Roothawg
    Member

    Welp, I have 10 vintage windows I have collected. I just didn’t feel like trying to explain to the contractors why we were installing old timey windows, so I will do those myself. I need the life size template so I can figure the spacing.
     
    Last edited: Aug 15, 2024
  25. Roothawg
    Joined: Mar 14, 2001
    Posts: 25,310

    Roothawg
    Member

    Day 4
    Walls going up. This is the upstairs rooms. IMG_4011.jpeg
     
  26. Roothawg
    Joined: Mar 14, 2001
    Posts: 25,310

    Roothawg
    Member

  27. nrgwizard
    Joined: Aug 18, 2006
    Posts: 2,823

    nrgwizard
    Member
    from Minn. uSA

    "I have 10 vintage windows I have collected."
    So, the back-story is; you rehabbed an old house & that was ~ all that could be salvaged, esp when you built up-to new code(s). :D :D.
    Marcus...
     
    Roothawg likes this.
  28. Roothawg
    Joined: Mar 14, 2001
    Posts: 25,310

    Roothawg
    Member

    Not really...there was a dude in Tulsa that worked for one of these vinyl window companies and he hated to see the old windows just get tossed, so he would haul them home and sell them cheap. He makes a little and saves some old architecture. I paid him like $20 per window for these. I've had these since page one of this build. I'm just getting around to using them soon.....
    [​IMG]
     
    Last edited: Aug 16, 2024
    drdave, porkshop, Okie Pete and 5 others like this.
  29. TraditionalToolworks
    Joined: Jan 6, 2019
    Posts: 458

    TraditionalToolworks
    Member
    from NorCal

    Did they raise that to allow for the floor trusses? I guess there will be a step at that walk to the floor area? You have a LOT of space, I'm green with envy.:D
     
    porkshop and Roothawg like this.
  30. Roothawg
    Joined: Mar 14, 2001
    Posts: 25,310

    Roothawg
    Member

    Yeah, they did. The Master Bedroom, closet, shower, laundry room etc. all got raised on the lower level. 9' ceilings. The dining room and kitchen are 8'.

    I really didn't want a step up, because that means I'll end up with a ramp on one end of the storage area, due to the fact that I am building a cargo elevator and planned on having a industrial style cart to move the bigger stuff.

    Not a huge deal, I have been thinking I may hinge it to where it folds up inside the door out of the way, when not needed.

    Yesterday, I got a phone call from my framer quizzing me about why I didn't have any ceiling joists in the storage area....so, apparently they(the people that built the lumber package) forgot to spec all that out. Of course they did...what another $1200 amongst friends?
     
    Last edited: Aug 16, 2024

Share This Page

Register now to get rid of these ads!

Archive

Copyright © 1995-2021 The Jalopy Journal: Steal our stuff, we'll kick your teeth in. Terms of Service. Privacy Policy.

Atomic Industry
Forum software by XenForo™ ©2010-2014 XenForo Ltd.