How much dry time is needed between coats with PPG , JAU , Acrylic urethane ? Temp. will be about 75 degrees. Is humidity a factor ? Thanks, Bob
Answered the same question yesterday: PPG product sheet JAU Direct Gloss Acrylic Urethane Dry times between coats 5 - 10 minutes at 70ºF (21ºC) Air dry Dust: 45 min Tack:3 to 5 hours Tape: 12 hours Dry:16 hours at 70ºF (21ºC) to polish and put into service Clear: 4-6 hours Force dry 30 minutes at 140ºF (60ºC), wait 8 hours to polish and put into service. IR 10 - 15 minutes
Dry times between coats 5 - 10 minutes at 70ºF (21ºC) As long as the Humidity is not above 65% (as a rule of thumb). If the Humidity is higher than 65%, give the flash time an extra 5 -10 minutes. You are still well within the window. Happy Spraying, VR&C.